Day 14

The main project of day 14 was to get the barrels up on the tower.


The first barrel.
The barrels a put on the tower via skids.

The barrels are carefully pulled up on the tower.


When the barrels reach the side of the platform, they are pulled in by manual power.

And then the last barrel...
...It went better than expected, and it did not take
 much more than four hours to get all barrels up.

Bourien helps with getting the barrels in position.


All the barrels and the railing are fixed and in the right position.
John has time to start collecting the manifold.

John and Anders connecting the manifold with the pipes that leads to the water posts...

... and Jacques and Bourien connects the barrels.